Close

Project

Tirol Chocolate Factory Project

Wastewater Treatment System

Investor: Tirol Choco Vietnam Co., Ltd.
Location: Amata Industrial Park, Dong Nai
General contractor: Cofico Co., Ltd.
M&E Contractor: Vietnam Kandenko Co., Ltd.
Treatment capacity: 10 m3 / day
Waste discharge standard: Input to centralized wastewater treatment system of Amata Industrial Zone
Installation time: 1/2020

 

Introduce:

Tirol Choco Vietnam Factory at Block 241, Street 12, Amata Dong Nai Industrial Park is the first project, marking the historic business development of Matsuo Confectionary Co., Ltd. when investing in manufacturing in Vietnam. Tirol Choco project has a construction area of ​​over 10,000 m2 of floor and is located in the key economic region of the Southeast region, Amata Industrial Park, Dong Nai.

Along with production and business activities, the factory has also paid great attention to environmental protection. In particular, it is possible to invest in the construction of daily-life wastewater treatment system, collecting and treating all wastewater generated from workers and office blocks with a capacity of 10m3 / day and night.

Okamura Vietnam is proud to be the partner of Tirol choco Factory by providing New Biotank domestic wastewater treatment system, meeting the current output standards according to the discharge standards into the treatment system. concentrated waste water in Amata Industrial Zone. In the future, the system still ensures its ability to meet higher emission standards without spending too much on investment.

Some pictures of New Biotank domestic wastewater treatment system with capacity of 10m3 / day and night:

 

1

Picture 1. Okamura’s Engineers proceed to fixed anchor the Newbiotank after unloading.

 

2-tram-dieu-khien

 

Picture 2. Control House: Methanol and PAC tanks, Control panel and Air blower covered by SUS 304 steel cabinet

4-huong-dan-van-hanh

Picture 3. Operating manual for investors.