Project Gas To Gasoline Plant – Turkmenistan
General Contractor: Kawasaki Joint Venture (Japan) and Ronesan (Turkey)
The Gas To Gasoline Project was invested by the Turkmenistan government, a joint venture between Japan’s Kawasaki Industrial Corporation and Turkey’s Ronesan. Based on abundant gas reserves in the country, the government of Turkmenistan has invested in a combination of FOs, Fuel Oils and Diesel Oils to create jobs for local people. as economic development of the country. Since the plant is built in the middle of the desert, electricity and water will be produced locally for the operation of the plant. Okamura Company has supplied the chlorine spray system for the water treatment plant of the project
- The capacity of chlorine spray system: 30kg / h
- Number of chlorine containers: 4 bottles per 2 tons
- Chlorine Evaporator: 1 set – Evoqua (USA)
- Chlorinator: 2 sets – Evoqua (USA)
- Chlorine leakage warning system includes: – Evoqua (USA)
- Monitor: 3 sets
- Chlorine detector: 6 sensor
- Booster Pump: 2 units – Grundfos (Japan)
- Chlorine Gas Scrubber – Evoqua (USA)
- Control system, monitoring and supervision:
- PLC S7-300: Siemens (Germany)
- HMI (Touch panel): Siemens (Germany)
The total value of the package is about US $ 1.44 billion. The plant is capable of producing 600,000 tons of petroleum products per year. It is expected that the factory will launch its first batch of products in the fourth quarter of 2018.